Nachdem der Hoster nun die "proc_*" Funktionen freigeschalten hat, habe ich nun in der Composer.json alle Werte mit "4.13.*" auf "5.0.*" gestellt und den Contaomanager noch mal angeworfen.
Nun kommt der nächste Fehler, dieses mal zum Contao-Kalender, obwohl bei dem zu lesen ist:
Code:
s Supported Contao version(s): 4.0+, 5.0+
Latest version: 5.6.8 (released on October 24, 2025 at 4:13 PM)
License(s): LGPL-3.0-or-later
Der Fehler des Composers:
Code:
> Resolving dependencies using Composer Cloud v3.8.2
[7.0MiB/0.25s] Loading composer repositories with package information
[94.7MiB/17.75s] Updating dependencies
[137.5MiB/18.50s] Your requirements could not be resolved to an installable set of packages.
[137.5MiB/18.50s]
Problem 1
- Root composer.json requires contao/calendar-bundle 5.0.* -> satisfiable by contao/calendar-bundle[5.0.0, ..., 5.0.10].
- contao/calendar-bundle 5.0.0 requires contao/core-bundle 5.0.0 -> found contao/core-bundle[5.0.0] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.1 requires contao/core-bundle 5.0.1 -> found contao/core-bundle[5.0.1] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.10 requires contao/core-bundle 5.0.10 -> found contao/core-bundle[5.0.10] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.2 requires contao/core-bundle 5.0.2 -> found contao/core-bundle[5.0.2] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.3 requires contao/core-bundle 5.0.3 -> found contao/core-bundle[5.0.3] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.4 requires contao/core-bundle 5.0.4 -> found contao/core-bundle[5.0.4] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.5 requires contao/core-bundle 5.0.5 -> found contao/core-bundle[5.0.5] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.6 requires contao/core-bundle 5.0.6 -> found contao/core-bundle[5.0.6] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.7 requires contao/core-bundle 5.0.7 -> found contao/core-bundle[5.0.7] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.8 requires contao/core-bundle 5.0.8 -> found contao/core-bundle[5.0.8] but these were not loaded, likely because it conflicts with another require.
- contao/calendar-bundle 5.0.9 requires contao/core-bundle 5.0.9 -> found contao/core-bundle[5.0.9] but these were not loaded, likely because it conflicts with another require.
[137.5MiB/18.50s] <warning>Running update with --no-dev does not mean require-dev is ignored, it just means the packages will not be installed. If dev requirements are blocking the update you have to resolve those problems.</warning>
[60.6MiB/18.56s] Memory usage: 60.61MB (peak: 231.22MB), time: 18.57s.
[60.6MiB/18.56s] Finished Composer Cloud resolving.
# Cloud Job ID wNz1yYuUFpdqwX5QDnlxS8XQID9bp08yXPXi1XgP3MfHO73FIbIHqjpBgEgq89iMRO2nriZydP31HVYthRAKvIH1fSo51yRYfJX4OHbBU9pLSvoEvPO75obhx failed
Seltsamerweise steht aber beim Contao-Kalender